Default BOM Revision Dates on Assembly Build in NetSuite 2024.2

In NetSuite 2024.2, work orders can now automatically select default BOM revision dates based on production start dates.

·2 min read·NetSuite 2024.2·From NetSuite Release Notes PDF

TL;DR Opening

Starting in NetSuite 2024.2, when the production start date of a work order falls within the effective date range of a Bill of Materials (BOM) revision, that BOM revision is automatically set as the default for the work order. This enhancement simplifies BOM management during the assembly process by ensuring the most relevant BOM version is in use, reducing errors and improving efficiency.

What's New

The introduction of default BOM revision dates allows manufacturers and production managers to streamline their assembly processes. Previously, users had to manually select the appropriate BOM revision when creating or updating work orders. With the new feature, the system intelligently designates the correct BOM revision based on the production start date, thereby improving accuracy in production planning and reducing the likelihood of discrepancies.

Benefits of the New Feature

  • Automation: The automatic designation of the BOM revision saves time and effort for users, leading to increased operational efficiency.
  • Reduced Errors: By selecting the correct BOM revision based on the effective dates, this feature minimizes the risk of production errors associated with outdated or incorrect BOM usage.
  • Enhanced Visibility: Users gain better clarity on BOM applications and production timelines as the system automatically manages these relationships.

How It Works

When you create a work order in NetSuite, the system checks if the production start date is within the range defined by the BOM revision's effective date. If it is, that BOM revision will be applied as the default for that work order.

This feature is particularly beneficial for organizations with multiple BOM revisions that may frequently change due to engineering updates or production optimizations. It ensures that teams are always working with the most up-to-date materials list available.

Who This Affects

  • Manufacturing Managers: Will benefit from reduced manual intervention.
  • Production Teams: Experience fewer errors with BOM updates.
  • Inventory Managers: Gain improved accuracy in inventory tracking as BOM revisions align with production schedules.

Key Takeaways

  • NetSuite 2024.2 introduces default BOM revision dates for work orders.
  • This enhancement automates BOM selection based on production start dates.
  • It aims to improve operational efficiency and reduce errors in production planning.
  • The feature is particularly useful for businesses with frequent BOM updates.
Source: Default BOM Revision Dates on Assembly Build/Unbuild NetSuite Release Notes PDF. This article was generated from official Oracle documentation and enriched with additional context and best practices.

Was this article helpful?