Starting in NetSuite 2026.1, the process for starting multiple operations linked by the Start-to-Start connection type has been refined. Previously, these operations would initiate at nearly the same time but with a minimal lag automatically calculated. With the new update, all operations sharing the same working hours will now start at precisely the same moment when no lag is defined.

Impact on Work Order Scheduling

When using the Start-to-Start connection type:

  • If there are no defined lags and operations share the same working hours, they begin simultaneously.
  • If these operations follow previous ones, they are connected following the same principles as before, adhering to defined connection types and any scheduled lag.

Additionally, the scheduling of subsequent operations linked by Start-to-Start will depend on the type of scheduling used in the Work Order, whether it’s Forward or Backward scheduling. This flexibility allows for more precise manufacturing operation management.

Benefits of Operations Overlap

These changes offer several advantages:

  • Improved Efficiency: By allowing simultaneous starts, the timeline for work orders can be significantly reduced, enhancing overall productivity.
  • Resource Optimization: Better scheduling helps utilize manufacturing resources more effectively, minimizing downtime between operations.

Configuration Requirements

To utilize the new simultaneous operations feature, ensure that the following features are enabled:

  • Assembly Items
  • Work Orders
  • Manufacturing Work In Process
  • Manufacturing Routing and Work Center

For details on setting up operations overlap, including how to select connection types and lag amounts, consult the appropriate topics in the documentation.

Frequently Asked Questions (4)

What prerequisites must be met to use the simultaneous start of operations in NetSuite 2026.1?
To use the simultaneous start of operations feature, ensure the following features are enabled: Assembly Items, Work Orders, Manufacturing Work In Process, and Manufacturing Routing and Work Center.
How does the simultaneous start feature interact with Forward and Backward scheduling types?
The scheduling of subsequent operations linked by Start-to-Start depends on the type of scheduling used in the Work Order, whether Forward or Backward, allowing for precise manufacturing management.
Does the simultaneous start feature apply to operations that have a lag defined?
No, the simultaneous start feature applies only when there are no defined lags between operations under the Start-to-Start connection type. If a lag is defined, traditional scheduling rules apply.
How does this feature affect existing operations that begin following the completion of previous ones?
Existing operations that follow the completion of previous operations will continue to adhere to defined connection types and any scheduled lags, maintaining their previous scheduling rules.

Weekly Update History (1)

Manufacturingadded

Added an entry for Updating Costs for Manufacturing Charges.

View Oracle Docs
Source: Simultaneous Start of Multiple Operations Oracle NetSuite Help Center. This article was generated from official Oracle documentation and enriched with additional context and best practices.

Was this article helpful?

More in Manufacturing

View all Manufacturing articles →

Also from NetSuite 2026.1

View all NetSuite 2026.1 changes →