Simultaneous Start of Multiple Operations in NetSuite 2026.1
NetSuite 2026.1 enhances simultaneous start of operations, ensuring operations start exactly at the same time, improving scheduling.
Starting in NetSuite 2026.1, the process for starting multiple operations linked by the Start-to-Start connection type has been refined. Previously, these operations would initiate at nearly the same time but with a minimal lag automatically calculated. With the new update, all operations sharing the same working hours will now start at precisely the same moment when no lag is defined.
Impact on Work Order Scheduling
When using the Start-to-Start connection type:
- If there are no defined lags and operations share the same working hours, they begin simultaneously.
- If these operations follow previous ones, they are connected following the same principles as before, adhering to defined connection types and any scheduled lag.
Additionally, the scheduling of subsequent operations linked by Start-to-Start will depend on the type of scheduling used in the Work Order, whether it’s Forward or Backward scheduling. This flexibility allows for more precise manufacturing operation management.
Benefits of Operations Overlap
These changes offer several advantages:
- Improved Efficiency: By allowing simultaneous starts, the timeline for work orders can be significantly reduced, enhancing overall productivity.
- Resource Optimization: Better scheduling helps utilize manufacturing resources more effectively, minimizing downtime between operations.
Configuration Requirements
To utilize the new simultaneous operations feature, ensure that the following features are enabled:
- Assembly Items
- Work Orders
- Manufacturing Work In Process
- Manufacturing Routing and Work Center
For details on setting up operations overlap, including how to select connection types and lag amounts, consult the appropriate topics in the documentation.
Frequently Asked Questions (4)
What prerequisites must be met to use the simultaneous start of operations in NetSuite 2026.1?
How does the simultaneous start feature interact with Forward and Backward scheduling types?
Does the simultaneous start feature apply to operations that have a lag defined?
How does this feature affect existing operations that begin following the completion of previous ones?
Weekly Update History (1)
Was this article helpful?
More in Manufacturing
- Manufacturing Mobile Enhancements in NetSuite 2026.1
Manufacturing Mobile enhancements in NetSuite 2026.1 improve usability for operators with new features for reporting operations and component consumption.
- Approval Rule Validation Process in SuiteApprovals
Approval rules in SuiteApprovals are validated based on uniqueness, priority, and saved search criteria.
- Bins Management Enhancements in NetSuite 2026.1
Starting in NetSuite 2026.1, bins management features enhance inventory tracking and organization within warehouses, improving operational efficiency.
- Manufacturing Improvements to Item Creation Records in NetSuite
Discover the new options for creating and updating assemblies in NetSuite with advanced BOMs, enhancing item creation records.
Also from NetSuite 2026.1
- Custom Tool Script Enhancements in NetSuite
NetSuite 2026.1 enhances custom tool scripts with execution logs, a new management page, and binary file support. TL;DR Opening
- Unlimited Sandbox Refreshes in NetSuite 2026.1
Starting in NetSuite 2026.1, sandbox accounts can be refreshed an unlimited number of times, enhancing testing capabilities.
- Enriched Bank Data for Improved Transaction Matching in NetSuite
Updated for NetSuite 2026.1: Enriched Bank Data feature enhances transaction matching accuracy using generative AI.
- Natural Language Queries in NetSuite AI
Updated for NetSuite 2026.1, featuring enhancements in natural language queries. The MCP Standard Tools SuiteApp offers enhanced AI-driven interaction with
Advertising
Reach Manufacturing Professionals
Put your product in front of NetSuite experts who work with Manufacturing every day.
Sponsor This Category